Welcome toNet rental Shaanxi
Add to Favorites | 中文版
Advance cheap actively to hire housing system construction
From;    Author:Stand originally

4, build cheap to lease housing file. The difficulty of housing of family of low income of the area that think of cogongrass that union finished in December 2007 joins an investigation, built objective to deserve to hire and live archives of chummage rent subsidy, to build perfect cheap to hire housing system in the round construction provided original basis.

5, cheap hires construction of housing start working. According to the area appoint, the scheduling of district government, the area that think of cogongrass is in man-made of the Lu Sanmu that consider booth inside board factory, 33.52 mus of land regard transfer as cheap rent a house the construction of 30000 ㎡. First phase project plans to build 20000 ㎡, the project plans to invest 22 million yuan, 8 6 layer mixture structures, find a place for resident 414, door model the largest floor area 49.69 ㎡, the smallest floor area 39.58 ㎡. First phase project on Feburary 20, 2008 start working, main body project predicts to be by June finishing.




Previous 1 2Next
About us | Legal Notices | Sitemap | wiki
Disclaimer:The only purpose of the site is to deliver more information. This dose not mean that the site will agree with the views and be responsible for its authenticity.